KCC was awarded the replacement of Bridge 0-10 by Monmouth County to improve safety and access.
Due to its age, there had been deterioration as well as chipping and cracking that could no longer be addressed by routine maintenance. The intent of the new bridge was to build a similar structure with modern material and design elements. The project spans across Deal Lake, which presented access obstacles along with the overly soft lakebed soil and required environmental guidelines. The logistical and operational challenges were strategically met and achieved by the KCC’s resources through innovative methods creating support for the concrete structure to ensure a safe and successful outcome.
Construction Highlights
Green Highlights